Rapid productivity gains across manufacturing & warehouse
From firefighting chaos to controlled operations.
What we walked into.
Manufacturing and warehouse operations were operating with limited structure and minimal performance visibility. Supervisors had received little or no formal training, and there was no consistent management operating system to control daily execution.
The operation lacked reliable OEE and downtime tracking, had no formal overtime control process, and no labor planning tied to workload. Warehouse layout and flow were inefficient, production items were not pre-marshalled, and maintenance controls were absent. Planning and scheduling were largely reactive.
Baseline TVO maturity was below Level 1, reflecting limited standard work, inconsistent accountability, and high variability across shifts.
How we delivered.
- Production and warehouse planning boards to stabilize daily execution
- Short-interval control boards and supervisor training
- Standardized shift startup procedures and guidelines
- Formal overtime control systems and procedures
- Daily and weekly performance reviews with root-cause analysis
- Daily resource planning and labor ordering tools aligned to workload
- Line planning standards supporting line selection, sequencing, and crew planning
- Improved controls to stabilize schedules and improve adherence
- Warehouse flow improvements and pre-marshalling of production items
- Digital performance tracking for real-time OEE and downtime visibility
- Bespoke supervisor training on the fundamentals of supervision
- Fully documented processes, procedures, and training materials
What got delivered.
- 16% direct productivity improvement achieved against baseline in an 8-week sprint
- $3.8M in annualized productivity savings realized in 8 weeks
- Roadmap established to deliver $10–$11M in annualized productivity savings
- $7.3M+ (15%) in savings delivered in 10 weeks using an accelerated target pricing approach
- 15% reduction in direct warehouse crewing through improved flow and labor planning
- More than 10% reduction in spoilage through improved inventory control and stock rotation
- Real-time OEE and downtime visibility enabled through digital performance tracking
- Improved schedule adherence and operational stability
- TVO maturity increased from below Level 1 to Level 2, with a clear path to Level 3
- All processes, procedures, and training documented and handed over
More case studies
All results →
$13M in savings for a QSR leader
From incumbent dependency to category excellence.

$14M in savings post-bankruptcy
Procurement transformation: category excellence, supplier conditioning, governance and spend visibility.

Optimizing distribution center network to lower operational costs and improve on-time fulfillment
$11M in annualized benefits.