Maine PointeResults. Now.™

Optimizing Sourcing, Construction, and Cost Reduction of Millions

8% savings in development.

8%
Savings in development
10%
Reduction in build-out cycle
11%
Reduction in cost-of-goods sold
Read the full case study →
The challenge

What we walked into.

What started out as a personal hobby turned into a chain of over 60 barbeque restaurants in eight states, with the goal of doubling that number. That fast growth in joints left the company with entrepreneur-level procurement and construction processes and tools. Pandemic supply chain issues caused skyrocketing costs and major construction delays, affecting revenue. At the same time, a long-term distributor contract locked the company into less-than-optimal costs for their main food ingredients.

The approach

How we delivered.

  • Traced the critical path for rollouts and gave the company greater scalability and certainty over construction
  • Reduced direct and indirect material costs
  • Improved access to data with new scheduling and costing tools that opened visibility into spend
  • Created dashboards based on KPIs and data analytics that provided a single source of truth
  • Initiated a procurement management operating (PMOS) system that matured the procurement department and raised its ability to control costs
The outcome

What got delivered.

8%
Savings in development
10%
Reduction in build-out cycle
11%
Reduction in cost-of-goods sold
  • 8% savings in development
  • 10% reduction in build-out cycle
  • 11% reduction in cost-of-goods sold
  • Improved visibility into a complex construction supply chain
  • Improved company’s competitive position
  • Built procurement management operating system (PMOS)
Want this in your business?
Talk to a partner.
Start the conversation →