One of the largest turnarounds in a plant’s history
Just three months away from the start of the largest shutdown in the history of a strategic production asset, the company made the difficult decision to terminate its general contractor.
Read the full case study →What we walked into.
Just three months away from the start of the largest shutdown in the history of a strategic production asset, the company made the difficult decision to terminate its general contractor. Up to this point the contractor had owned and drive the turnaround. To add to our client's concerns, the same contractor was responsible for construction of a new sister plant which was running 18 weeks behind schedule.
With a turnaround budget set at $60M and potential losses across the asset totaling $3M per day for every day of overrun, fast and decisive action was required to avert a major cost overrun.
The operator needed to identify the gaps, close them and reallocate responsibilities to ensure that the shutdown happened on time, on budget and without anybody getting hurt. Determined that postponement was not an option, the asset manager called on a trusted contact at Maine Pointe to deliver.
What got delivered.
More case studies
All results →
Driving strategic, sustainable savings in procurement and logistics
$17 million in annualized benefits, an average of 15% savings on addressed categories.

Breaking supplier dependency to drive substantial cost savings
43% savings on procurement spend.

Scaling carbon capture: clearing the critical path of innovation from pilot to full production
Evaluated preparedness to successfully deliver on current on-going carbon capture project.