Enhancing rail fleet logistics efficiencies and safety procedures
The operating partner in a midstream joint venture was concerned about efficiency, costs and safety procedures at a plant commissioned in 2013.
Read the full case study →What we walked into.
The operating partner in a midstream joint venture was concerned about efficiency, costs and safety procedures at a plant commissioned in 2013. Managers wanted to be assured that the plant would meet the demands of a planned threefold increase in production in just 9 months.
Aware of Maine Pointe's expertise in the field of rail logistics, the operating partner engaged us to help them to optimize yard operations, increase velocity of railcar movement and introduce a zero risk rail and loading safety culture at the plant.
What got delivered.
More case studies
All results →
Driving strategic, sustainable savings in procurement and logistics
$17 million in annualized benefits, an average of 15% savings on addressed categories.

Breaking supplier dependency to drive substantial cost savings
43% savings on procurement spend.

Scaling carbon capture: clearing the critical path of innovation from pilot to full production
Evaluated preparedness to successfully deliver on current on-going carbon capture project.